Who is responsible for the cost associated with the purchasing of the stock glass for the BRT that we are required to stock and store?
Is there an elevation of each glass type available that references the BRT stock glass pricing (ie. Type A, Type B, Type C)?
by Seller·5 months ago
Supplier is responsible for any cost associated to Stock and Store those items. Refer Appendix C - Pricing form for more clarification as the pricing evaluation will be cumulative of each Table separately.
by The City of Calgary·5 months ago
Hi Nick,
Sorry, this is my first time working with Ariba, I can only see Appendix C download showing pages 45 thru 48 of 66. Only shows areas for submitting pricing, no drawings or elevation relating to the stock glazing sizes.
by Seller·5 months ago